GRP: |
Strait of Juan de Fuca
|
Strategy Area: |
McDonald Creek CLA0152
|
Strategy Number: |
STR-31
|
Checked By: |
USCG/NW Oil spill control course
|
Date: |
8/19/2009
|
Type: |
Field Test
|
Latitude: |
|
Longitude: |
|
Location: |
East of Port Angeles, along creekbed...
|
Response Strategy: |
DRILL
Accessed via water, 2 medium deployment boats (2500' boom collectively) and 1 small work boat. 07 personnel, plus boat drivers.
drug boom out from medium sized vessels due to shallow water preventing vessels from accessing shore (work boat e
|
Feet/Type of Boom: |
GRP calls for 400 feet of boom. 600 ft was employed. Recommend re-evaluation of required boom. 400 would not have been nearly enough (nearly 300 feet of boom was used simply to get across large beach to high-tide line).
|
Strategy Implementation: |
|
Staging Area: |
Ediz Hook boat ramp.
|
Site Access: |
|
Resources Requiring Protection: |
|
Comments: |
|